Copper Pipe Cutting for Electric Vehicle Charging Station Network
Client: BMW Group Factory Munich
Request: Prepare and cut copper grounding pipes for a network of 35 electric vehicle charging stations being installed throughout the factory parking facilities. Each station requires precise copper pipe connections for proper grounding.
Contract Type: Industrial installation
Working Environments
- In the clean assembly area at Elektro Schmidt workshop, well-organized with proper workbenches and good lighting
- At various locations throughout the BMW factory parking areas, some indoor (well-lit, concrete floor) and some outdoor (exposed to weather conditions)
- In utility trenches at the parking facility, confined space with limited lighting and ventilation