Industrial Control System Installation
Client: BMW Manufacturing Plant
Request: Installation of new electrical conduit systems for a factory floor expansion, requiring extensive cutting and fitting of rigid metal conduits to connect new machinery to the main power distribution center.
Contract Type: Commercial installation
Working Environments
- Factory floor with active machinery nearby, moderate noise levels, requiring careful coordination with production schedule
- Above suspended ceilings on mobile scaffolding where pipe cutting must be performed carefully to avoid debris falling onto work areas below
- Electrical service rooms with limited space requiring precise measurements and cuts of metal conduits using pipe cutters
- At the client's technical room with concrete floors and good lighting but limited ventilation when cutting electrical conduits
- In the company workshop preparing pre-fabricated conduit assemblies with pipe cutters at ergonomic workbenches in well-lit conditions